top of page

Agriculture & Farming Safe Work Method Statement (SWMS) Value Pack

 

Introduction:

The Agriculture & Farming SWMS Value Pack is expertly designed to support agricultural and farming businesses by enhancing safety across a wide array of activities. This comprehensive package includes 35 SWMS templates covering essential operations from basic manual handling to more complex tasks like chemical spraying and working near water. Each template facilitates easy integration into your Workplace Health and Safety (WHS) management systems and is fully customisable, enabling precise documentation of hazards and safety controls specific to agricultural settings, thereby improving safety management practices.

 

SWMS Included in the Pack:

  1. Air Compressor
  2. Boating and Working From Boat
  3. Chainsaw
  4. Chemicals
  5. Chemical Spray
  6. Confined Space Entry
  7. Driving a Vehicle
  8. Driving in Remote Locations
  9. Erosion & Sediment Control
  10. Fencing
  11. Forklift
  12. Fuel
  13. Fuel Storage, Refuelling, and Decanting
  14. General Plant
  15. Hand, Air & Power Tools
  16. Handling of Hazchem
  17. Heavy Lifting Using Forklift, Jibs, and Slings
  18. Ladder
  19. Landscaping Activities (pruning)
  20. Loading and Unloading Pallets
  21. Loading and Unloading Trucks
  22. Manual Handling
  23. Mechanical Lifting
  24. Mobile Plant
  25. Operation of Trucks
  26. Petrol Generator
  27. Preparation of Load Export Containers
  28. Refuelling Plant & Equipment
  29. Remote Location & Working Alone
  30. Telehandler Forklift
  31. Trenching & Excavating
  32. Working Around Plant & Equipment
  33. Working at Heights
  34. Working Near Water
  35. Working Outdoors

 

 

Additional Resources:

With the purchase of the Agriculture & Farming SWMS Value Pack, you will receive a complimentary copy of our Legislation & Codes of Practice Reference List. 

 

Key Features:

The Agriculture & Farming SWMS Value Pack is a vital tool for documenting and managing workplace safety in the agricultural sector. Designed for ease of use and rapid customisation, these templates allow businesses to effectively tailor safety documentation to their specific needs. This value pack not only helps maintain high safety standards but also simplifies the process of safety documentation, allowing businesses to focus more on their core operations. Equip your agricultural business with this comprehensive package to foster a safer working environment and streamline compliance with safety practices.

Agriculture & Farming Safe Work Method Statement (SWMS) Value Pack

$795.00 Regular Price
$395.00Sale Price
GST Included

We accept the following payment methods:

    • Instant delivery via email.
    • Easily add your logo and business details.
    • Fully Editable (Microsoft Word Format).
    • Customisation instructions provided.
    • In line with Australian legislation.
    • Pay once, no ongoing subscriptions.

Related Products

bottom of page