top of page

Building & Construction Safe Work Method Statements (SWMS) Value Pack

 

Introduction:

The Building & Construction SWMS Value Pack is specifically designed for businesses within the building and construction industry. This comprehensive package offers 44 fully customisable SWMS templates that cover everything from routine tasks to high-risk activities, enabling your business to more effectively document common hazards and safety controls. These templates can be seamlessly integrated into your Workplace Health and Safety (WHS) management systems and customised to meet the specific needs of your business operations, enhancing safety management.

 

SWMS Included in the Pack:

  1. Air Compressor
  2. Building Site Cleans
  3. Angle Grinder
  4. Asbestos Exposure
  5. Brick Saw
  6. Cement Mixer
  7. Chemicals
  8. Circular Saw
  9. Concrete Nail Gun
  10. Concreting
  11. Confined Space Entry
  12. Covid 19
  13. Drill Press
  14. Driving a Vehicle
  15. Electrical Work
  16. Elevated Work Platforms (EWP)
  17. Excavator
  18. Fuel Storage, Refuelling, and Decanting
  19. General Plant
  20. Hand, Air & Power Tools
  21. Heavy Lifting Using Forklift, Jibs, and Sling
  22. High Risk Construction Work (HRCW)
  23. Hot Works
  24. Ladder
  25. Manual Handling
  26. Mechanical Lifting
  27. Mobile Plant
  28. Painting
  29. Plastic Duct Installation
  30. Plumbing & Drainage Work, Roof Repairs
  31. Site Safety (General)
  32. Skid Steer
  33. Slab (Preparation, Pouring & Finishing)
  34. Tipper
  35. Trenching & Excavation
  36. Watercart
  37. Welding & Cutting
  38. Wiring
  39. Working Around Plant & Equipment
  40. Working Around The Public
  41. Working at Heights
  42. Working Outdoors
  43. Working with Electricity
  44. Working with Silica

 

Additional Resources:

With every purchase of the Building & Construction SWMS Value Pack, customers receive a complimentary copy of our Legislation & Codes of Practice Reference List. 

 

Key Features:

The Building & Construction SWMS Value Pack offers a quicker and easier way to document workplace safety processes across a diverse range of construction activities. Designed for rapid customisation and ease of use, these templates help businesses efficiently document their safety practices. Equip your business with the tools it needs to maintain a safe and compliant working environment.

Building & Construction Safe Work Method Statements (SWMS) Value Pack

$795.00 Regular Price
$495.00Sale Price
GST Included

We accept the following payment methods:

    • Instant delivery via email.
    • Easily add your logo and business details.
    • Fully Editable (Microsoft Word Format).
    • Customisation instructions provided.
    • In line with Australian legislation.
    • Pay once, no ongoing subscriptions.

Related Products

bottom of page