Transportation & Warehousing Safe Work Method Statements Value Pack | Everything OHS
top of page

Transportation & Warehousing Safe Work Method Statements (SWMS) Value Pack

 

Introduction:

The Transportation and Warehousing SWMS Value Pack is a comprehensive bundle of templates designed to help businesses in the transportation and warehousing sectors document their safety procedures effectively. This value pack comprises 38 detailed SWMS templates that cover a wide range of activities, from general driving and manual handling to specific operations such as rigging, chain blocks, and telehandler forklift operations. These templates are fully customisable, allowing easy integration into your existing Workplace Health and Safety (WHS) management systems.

 

SWMS Included in the Pack:

  1. Chemicals
  2. Cleaning of Vehicles
  3. Confined Space Entry
  4. Driving a Vehicle
  5. Driving in Remote Locations
  6. Elevated Work Platforms (EWP)
  7. Forklift
  8. Fuel Storage, Refuelling, and Decanting
  9. Fuel
  10. General Plant
  11. Hand, Air, and Power Tools
  12. Handling Hazchem
  13. Heavy Lifting Using Forklift, Jibs, and Slings
  14. Ladder
  15. Loading and Unloading Pallets
  16. Loading and Unloading Trucks
  17. Manual Handling
  18. Manual Jack
  19. Manual Tyre Change
  20. Mechanical Lifting
  21. Mobile Plant
  22. Operation of Trucks
  23. Picking Up and Unloading of Skip Bin
  24. Preparation of Load Export Containers
  25. Refuelling Plant and Equipment
  26. Rigging & Chain Blocks
  27. Telehandler Forklift
  28. Tipper
  29. Traffic Control
  30. Traffic Management Sign Setup
  31. Truck Driving (Fatigue)
  32. Truck Driving (Speed)
  33. Truck Driving (General)
  34. Truck Haulage
  35. Truck Mounted Crane
  36. Watercart
  37. Working Around Plant & Equipment
  38. Working Around The Public

 

Additional Resources:

Purchase of the Transportation and Warehousing SWMS Value Pack includes a free copy of our Legislation & Codes of Practice Reference List.

 

Key Features:

This SWMS Value Pack is specifically designed to give transportation and warehousing businesses a range of robust tools for documenting and managing workplace safety. The templates are easy to use and quick to customise, allowing you to tailor them to specific operational needs. Equip your team with this comprehensive package to help ensure a safer working environment.

 

Transportation & Warehousing Safe Work Method Statements Value Pack

$395.00 Regular Price
$295.00Sale Price
GST Included
  • Instant delivery via email.
  • Easily add your logo and business details.
  • Fully Editable (Microsoft Word Format).
  • Customisation instructions provided.
  • In line with Australian legislation.
  • Pay once, no ongoing subscriptions.

Related Products

bottom of page